A Shenzhen factory focused on the details of your part
Shenzhen Ruishuo Hardware Co., Ltd. was founded in 2009. Operating as Ruishuo Metal, the factory is based in Yanluo, Bao’an District, Shenzhen, with a focus on metal shielding parts and precision stamped hardware.
A useful manufacturing discussion starts with the part: the circuit area it covers, the way it fits the PCB and enclosure, the material and finish it requires, and the sample and inspection evidence needed for approval. Connecting these details allows drawing review to support the actual manufacturing work.

Structure, tooling and assembly supply are connected inputs
Structural and material review
Review single-body shields, frame-and-lid combinations, multiple cavities and supporting hardware against the available space, mounting, access and material requirements.
Tooling and manufacturing
Use the drawing revision, part features and production requirements to review precision stamping, deep drawing and the appropriate sample route.
Inspection and packaging
Bring the critical dimensions, assembled fit, document scope, supply direction and labels into the sample and order plan.
In-house die-making supports the manufacturing discussion
Ruishuo has in-house tooling capability, linking die design and CAD/CAM simulation with stamping, finishing and final inspection. Factory tooling output exceeds 100 sets per month, and the equipment includes more than 20 precision stamping presses.
For a shielding part, tool quality must be discussed at the relevant feature: an attachment edge, a lid engagement detail, a partition location or an opening. The drawing datums and intended assembly provide the checks for evaluating trial parts.
Build cooperation around an agreed project scope
Projects can begin with common 2D or 3D drawing formats or a physical sample. Before quotation, identify the fixed requirements and the options still open to review. Discuss NDA and information-sharing arrangements before sending confidential design materials.
Samples are charged. Standard samples take 3–5 days, expedited sampling is 48 hours, and tooling with sample production takes 7–10 days within the confirmed plan. These are sample-stage schedules. Volume quantity, inspection, packaging and delivery are reviewed separately.
Management-system certificates and test documentation are displayed according to the supplied files. The actual part parameters, verification work and document deliverables follow the drawing, approved sample and project agreement.
Company and factory contact
| Item | Information |
|---|---|
| Company | Shenzhen Ruishuo Hardware Co., Ltd. / Ruishuo Metal |
| Address | Unit 101, Factory Building 3, No. 29-1 Wuyuan Road, Tangxiayong Community, Yanluo Subdistrict, Bao’an District, Shenzhen, Guangdong, China |
| Telephone | +86-19146468662 |
| +86-19146468662 | |
| chinarswj@shieldingcover.com |
Start with the structure, application, current drawing revision and expected quantity. If a material or process is still undecided, identify the question so the engineering team can review it with the rest of the design.