Shenzhen Ruishuo · Custom EMI shielding & precision metal partschinarswj@shieldingcover.com+86-19146468662

Product catalog / Custom manufacturing

Frames, Lids & Clips

Specify mating parts, working positions and component or matched-set supply.

Shielding references for real design decisions

Specify mating parts, working positions and component or matched-set supply.

← Browse the full catalog

6 product references shown

Define the partner for every frame, lid or clip

The mating assembly gives a component its role. Provide the corresponding frame, cover, can edge or PCB revision even when the request covers only one part. Inspect working position and installation access in addition to the loose component dimensions.

Define the sample before comparing it

Provide the drawing revision, material, mating components and required acceptance checks. Samples are chargeable. Reference planning is 3–5 days for standard samples, 48 hours for expedited sampling, and 7–10 days for tooling and sample production. These arrangements exclude mass-production delivery; the actual project scope and timing are reviewed separately.

Discuss the drawing package

Talk to Ruishuo Engineering

Turn your drawing into a reviewed manufacturing plan.

Share the drawing revision, material, quantity and critical assembly requirements.

Discuss Your Project →
WhatsApp